万维读者网>世界军事论坛>帖子
升级的枭龙第二批在巴开始组装
送交者: 古宇庙 2014-06-28 05:41:29 于 [世界军事论坛]

First Block 2 JF-17s under construction in Pakistan

26 June 2014
   

Production of the first two of 50 Block 2 JF-17s on order by the Pakistan Air Force (PAF) is now well under way at the Pakistan Aeronautical Complex, Kamra, with the first expected to fly by the end of the year.


Production of the first two of 50 Block 2 JF-17s on order by the Pakistan Air Force is now well under way at the Pakistan Aeronautical Complex, Kamra. (Alan Warnes)Production of the first two of 50 Block 2 JF-17s on order by the Pakistan Air Force is now well under way at the Pakistan Aeronautical Complex, Kamra. (Alan Warnes)


The Block 2 JF-17 has several capability increases over the Block 1s, but the main boost to the PAF as well as to export potential is the installation of an air-to-air refuelling system. One aircraft has been fitted with a refuelling probe, which protrudes from the right side of the fuselage just behind the cockpit, sitting forward of the pilot's position.

0.00%(0) 0.00%(0) 0.00%(0)
当前新闻共有2条评论
  升级有:电传,载荷多一吨,空中加油  /无内容 - 古宇庙 06/28/14 (160)
    不信加装设备后载重还能增加1000公斤。  /无内容 - 老粗 06/29/14 (66)
笔  名 (必选项):
密  码 (必选项):
注册新用户
标  题 (必选项):
内  容 (选填项):